We want it on-prem, so we stay in control
Your own server sounds like control. Then I ask who patches it and when a backup restore was last tested. Control is not where the machine stands, but whether someone demonstrably looks after it.
01/09/2026
And will you be watching us through this?
The most honest question of the whole project is never asked in a meeting. It comes aside, at the machine, once the managers step away. And it deserves an honest answer, not evasion.
25/08/2026
The most expensive integration looks like the cheapest one at first
A direct link between two systems is quick and cheap. The fifth direct link is a web nobody wants to touch. When a shared foundation pays off, and when it honestly does not.
18/08/2026
The machine knew about the fault for 40 minutes. It had nobody to tell
A press starts producing rejects, the maintenance technician hunts for the cause, and then the data shows it: oil temperature had been climbing for forty minutes. The machine knew all along. It just had nobody to tell.
13/08/2026
Nobody can price an hour of downtime to the euro. And that is not the point
Most companies make big maintenance and monitoring decisions without one number: what an hour of line standstill costs them. An exact number does not exist. A working one does.
06/08/2026
The question from IT that I like most in meetings
It comes almost always from someone in IT: is it even safe to let those machines into the network? Many suppliers treat it as a delay. I hear a signal about the customer in it.
04/08/2026
Am I buying another dead end?
The question of whether we can connect this too never comes at the start of a meeting. It comes once the talk gets concrete. And it is not really about technology, but about the fear of another isolated island.
30/07/2026
Software won't replace the people you don't have
A company feels it lacks visibility and buys a system. What it often lacks is a person who would own the topic. The system will not fill that gap by itself.